TSE WATER LINE & KAHRAMAA WATER LINE MODIFICATION WORKS @ CENTRAL PLANT 3, 6 & 7.
SUPPLY AND INSTALLATION OF DUCTILE IRON PIPES AND FITTINGS (200MM, 250MM, 300MM, 350MM, 400MM & 450MM DIA @ CENTRAL PLANT 3, 6 & 7.
SUPPLY, FABRICATION AND INSTALLATION OF CARBON SEAMLESS STEEL PIPE AND FITTINGS (200MM, 250MM & 300MM DIA) @ CENTRAL PLANT 7.
SUPPLY, FABRICATION AND INSTALLATION OF GRP PIPE AND FITTINGS (200MM & 250MM DIA) @ CENTRAL PLANT 7.
SUPPLY AND INSTALLATION OF PIPE INSULATION & ALUMINIUM CLADDING WORKS FOR 200MM & 250MM DIA PIPES & FITTINGS @ CENTRAL PLANT 7.
REFURBISHMENT OF PLUMBING WORKS FOR JETTY AREA PUMPING STATION (WEST SIDE) @ DOHA NAVAL BASE-
SUPPLY AND INSTALLATION OF PIPE INSULATION & ALUMINIUM CLADDING WORKS FOR 100MM & 150MM DIA PIPES & FITTINGS @ DOHA NAVAL BASE.
REPLACEMENT OF CONCRETE FLOORING FOR FIRE DEPARTMENT BUILDING @ DOHA NAVAL BASE.
REPLACEMENT OF FLOORING FOR HEADQ UARTER BUILDING @ DOHA NAVAL BASE.
SUPPLY & INSTALLATION OF OVERHEAD NET FOR THE PRISION OPEN YARD @ MAIN GATE HOUSE BUILDING FOR DUHAILIYAT.
REFURBISHMENT OF FLOORING FOR ADMINISTRATION HEAD QUARTER BUILDING @ SAILIYAH CAMP.
INSTALLATION OF PU FORM WATERPROOFING FOR COS ADMINISTRATION BUILDING @ MOD RUMAILLAH.
LIGHTNING PROTECTION FOR AMMUNITION STORE FOR INTELLIGENCE CAMP @ SAILIYAH CAMP.
EPOXY FLOORING WORKS FOR FIRE DEPARTMENT BUILDING @ DOHA NAVAL BASE.
REPLACEMENT OF GRP WATER TANK FOR MAIN WATER SOURCE @ DOHA NAVAL BASE.
REFURBISHMENT VENTILATION SYSTEM FOR SOLDIER’S MESS @ NORTH CAMP.
GRP LINING WORKS FOR JETTY AREA WATER TANK @ DOHA NAVAL BASE.
SUPPLY & INSTALLATION OF HVAC CHILLED WATER SYSTEM PIPING WITH INSULATION, VALVE PACKAGE, BTU METER, PUMPS (PRIMARY & SECONDARY) AND HEAT EXCHANGER @ B+G+4 RESIDENTIAL BUILDING, LUSAIL
INTERIOR & FIT OUT WORKS FOR SADDLE BAG OFFICE @ HAMMAD INTERNATIONAL AIRPORT.
COMPLETE ELECTRICAL & FIRE ALARM SYSTEM WORKS FOR BEUMER WAREHOUSE @ HIA EXTENSION PROJECT.
FIRE FIGHTING SYSTEM, FIRE ALARM SYSTEM AND EQUIPMENT INSTALLATION FOR GWC WAREHOUSE @ AL WAKRA LOGISTICS PARK.
OVERHAULING & REINSTALLING OF 4 NOS 150 HP SUBMERSIBLE PUMP & BFV @ WAKRAH STADIUM.
CHILLED WATER PIPELINE MODIFICATION WORKS @ AL SAAD STADIUM.
INTERIOR & FIT OUT WORKS FOR ABC GROUP @ DOHA OFFICE.
SUPPLY AND INSTALLATION OF BLACKOUT BLINDS WITH MOTORIZED SYSTEM FOR QATAR RAIL MAIN OFFICE @ RAIL TOWER, AL-SAAD.
FIRE FIGHTING SYSTEM, FIRE ALARM SYSTEM INSTALLATION FOR GTC (G+1) FACTORY & OFFICE BUILDING @ NEW INDUSTRIAL AREA.
SUPPLY AND INSTALLATION OF HVAC DUCT WORKS FOR B+G+5 COMMERCIAL BUILDING @ LUSAIL.
INTERIOR & FIT OUT WORKS FOR BRIGHT GYM @ AL WAKRAH.
BLOCK AND PLASTERING WORKS FOR 53NOS VILLA RESIDENTIAL PROJECT @ AIN-KHALID
COMPLETE RENOVATION WORKS FOR SHEIKH AHMAD BIN ALI PALACE @ AL RAYYAN.
GRP LINING WORKS FOR RESORT PROJECT @ THE PEARL QATAR.
PU FORM WATER PROOFING FOR WAREHOUSE @ INDUSTRIAL AREA - AL FARDAN.
TILE & MARBLE FIXING WORKS FOR 5-STOREY RESIDENTIAL BUILDING @ AL HILAL – AL MAJED GROUP.
HVAC PIPE INSTALLATION FOR (G+1) FACTORY & OFFICE BUILDING @ NEW INDUSTRIAL AREA.
SUPPLY OF STREET LIGHT POLES & FITTINGS FOR VILLA COMPLEX PROJECT @ SIMAISMA – SAP REAL ESTATE.
ROOF WATER PROOFING WORK FOR RESIDENTIAL BUILDING CONSTRUCTION PROJECT - LUSAIL CITY.
EPOXY FLOORING WORK FOR HOTEL APARTMENTS BUILDING PROJECT @ FEREEJ ABDUL AZIZ.
And more....